Mostrar el registro sencillo del ítem

dc.contributor.authorNaranjo Ureña, Ronald
dc.contributor.authorUlate Castillo, Alonso
dc.contributor.authorRuiz Cubillo, Paulo
dc.date.accessioned2019-05-06T16:27:53Z
dc.date.available2019-05-06T16:27:53Z
dc.date.issued2018
dc.identifier.urihttps://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1596
dc.description.abstractEl mejoramiento de la Ruta Nacional 606 en la Sección Guacimal – Santa Elena, inició su historia reciente con la ejecución de la Licitación Pública No.2011LN-0029-0DI00 “Mejoramiento del Sistema de Drenaje y de la Superficie de Ruedo de la Ruta Nacional No. 606 Sección Guacimal – Santa Elena”. Esta contratación se ejecutó entre 2013 y 2015, durante la cual se realizaron actividades de excavación para la ampliación de la plataforma del camino, mejoramiento de los cabezales y pasos de alcantarilla, colocación de una capa de sub-base granular de 20 cm de espesor, entre otras. Posteriormente, se detuvieron las obras en el camino hasta la publicación de la Contratación Directa Concursada “Mejoramiento de la Ruta Nacional No. 606 Sección Guacimal – Santa Elena”, la cual incluye actividades de diseño, excavación y estabilización del kilómetro 13, así como de otras zonas inestables, muros de gaviones, reposición de material erosionado de subbase granular, base estabilizada con cemento, mezcla asfáltica en caliente como superficie de ruedo, barreras guardacaminos, señalamiento horizontal y vertical, entre otras. Las obras correspondientes a esta contratación se encuentran en ejecución desde 2017 hasta la fecha. Hasta el momento se han realizado actividades de excavación y estabilización en el km 13, así como la colocación de 2 km de subbase granular y 1 km de base estabilizada con cemento (a julio 2018). Se indica por parte de la Administración, que las actividades de colocación de subbase granular y base estabilizada con cemento no han sido aceptadas y pagadas hasta el momento, sin embargo, los funcionarios del LanammeUCR observaron durante la última gira de fiscalización que el avance de obra continúa en el sitio. De acuerdo con los resultados obtenidos de los ensayos realizados por el LanammeUCR, a las muestras de material granular del Proyecto “Mejoramiento de la Ruta Nacional No. 606, Sección Guacimal – Santa Elena”, este material no cumple con las especificaciones mínimas establecidas en el Manual de Especificaciones Generales para la Construcción de Carreteras, Caminos y Puentes CR-2010 para la construcción de las capas de subbase y base estabilizada, por lo tanto, según la normativa aplicable este material no es mecánicamente competente para la construcción de carreteras en Costa Rica.
dc.description.abstractThe improvement of National Route 606 in the Guacimal - Santa Elena Section, began its recent history with the execution of Public Bid No.2011LN-0029-0DI00 "Improvement of the Drainage System and the Rolling Surface of the National Route No 606 Guacimal Section - Santa Elena ". This contract was executed between 2013 and 2015, during which excavation activities were carried out for the expansion of the road platform, improvement of the heads and sewer passages, placement of a layer of granular sub-base of 20 cm thickness, among other. Subsequently, work on the road was halted until the publication of the Concurred Direct Contracting "Improvement of National Route No. 606 Guacimal - Santa Elena Section", which includes design, excavation and stabilization activities of kilometer 13, as well as other unstable areas, gabion walls, replacement of eroded material of granular subbase, cement-treated base, hot mix asphalt as a road surface, crash barriers, horizontal and vertical signaling, among others. The works corresponding to this contract are in execution from 2017 to date. So far, excavation and stabilization activities have been carried out in km 13, as well as the placement of 2 km of granular subbase and 1 km of cement-treated base (to July 2018). It is indicated by the Administration, that the activities of placement of granular subbase and cement-treated base have not been accepted and paid up to the moment, nevertheless, the staff of LanammeUCR observed during the last inspection tour that the advance of work continues on the site. According to the results obtained from the tests carried out by the LanammeUCR, to the samples of granular material of the Project "Improvement of National Route No. 606, Section Guacimal - Santa Elena", this material does not meet the minimum specifications established in the Manual of General Specifications for the Construction of Roads, Pathways and Bridges CR-2010 for the construction of the layers of subbase and stabilized base, therefore, according to the applicable regulations this material is not mechanically competent for the construction of highways in Costa Rica.
dc.language.isoeses
dc.publisherLaboratorio Nacional de Materiales y Modelos Estructurales (LanammeUCR)es
dc.subjectInfraestructuraes
dc.subjectNormativa técnicaes
dc.subjectMaterial granulares
dc.subjectFiscalizaciónes
dc.subjectInfrastructurees
dc.subjectTechnical regulationses
dc.subjectGranular materiales
dc.subjectSupervisiones
dc.titleInforme de fiscalización: Ruta Nacional No. 606: Sección Guacimal – Santa Elenaes
dc.title.alternativeLM-PI-UGERVN-15-18es
dc.typeinforme técnicoes
dc.description.procedenceUCR::Vicerrectoría de Investigación::Unidades de Investigación::Ingeniería::LanammeUCRes


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem