• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Evaluación de las práticas constructivas de conservación vial, zonas 1-3, 2-4, 4.1, 4-2 Y 4-3

    Thumbnail
    View/Open
    LM-AT-050-09.pdf (1.685Mb)
    Date
    2009-12
    Author
    Chaverri Jiménez, Jenny
    Acosta Hernández, Erick
    Metadata
    Show full item record
    Abstract
    La reconstrucción de carreteras con actividades de mantenimiento de conservación vial evidencian la ausencia de un Sistema de Administración de Carreteras (SAC) que sirva de herramienta para conocer de previo las necesidades de reconstrucción y mantenimiento de la red vial nacional, que permita ejecutar los trabajos bajo una figura de contratación técnica y financiera acorde con las necesidades de cada vía y no bajo un contrato cuyo objeto es específicamente el mantenimiento. Los temas tratados en las observaciones y hallazgos evidenciados en este informe ya han sido tratados en informes previos emitidos por la Unidad de Auditoría del LanammeUCR (desde el año 2003). Esta situación permite establecer que la Administración (MOPT-CONAVI) no ha logrado ser efectiva en la totalidad de las acciones correctivas que ha emprendido con respecto a la seguridad vial en obras e incumplimientos del cartel para que se cumplan las especificaciones del cartel de licitación LP-01-2005 que guían el proceso de conservación vial.
     
    The reconstruction of roads with maintenance activities of road conservation evidence the absence of a Highway Administration System (SAC) that serves as a tool to know of previous reconstruction and maintenance needs of the national road network, which allows work to be carried out under a figure of technical and financial contracting according to the needs of each road and not under a contract whose purpose is specifically maintenance. The issues addressed in the observations and findings evidenced in this report have already been addressed in previous reports issued by the Audit Unit of the LanammeUCR (since 2003). This situation makes it possible to establish that the Administration (MOPT-CONAVI) has not been effective in all the corrective actions it has undertaken with respect to road safety in works and breaches of the cartel so that the specifications of the LP bidding poster are met -01-2005 that guide the road conservation process.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1397
    Collections
    • Informes [1127]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr