• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Proyecto Conservación vial, zona 2-4, ruta N° 21, Nicoya -Pueblo viejo

    Thumbnail
    View/Open
    LM-AT-55-07 Proyecto de Conservación Vial, zona 2-4 Ruta N°21 Nicoya-Pueblo Viejo.pdf (167.7Kb)
    Date
    2007-07
    Author
    Chaverri Jiménez, Jenny
    Rodríguez Castro, Ellen
    Morales Granados, Guillermo
    Metadata
    Show full item record
    Abstract
    El señalamiento preventivo es colocado en este frente de trabajo se debe reforzar. En las proximidades a la zona donde se realizaban las actividades de colocación de mezcla asfáltica había únicamente dos señales preventivas, al inicio y al final. No se contaba con cantidad de conos suficientes que delimitaran la zona de trabajo. El riego de liga colocado no es uniforme. El riego de liga colocado previo a la colocación de la mezcla asfáltica no es uniforme y parte del mismo ha sido desplazado por el equipo de construcción empleado en este frente de trabajo, lo que puede favorecer el desprendimiento de la mezcla recientemente colocada.
     
    The preventive signaling is placed on this front of work should be reinforced. In the vicinity of the area where the asphalt mix placement activities were carried out, there were only two preventive signs, at the beginning and at the end. There were not enough cones to delimit the work area. The irrigation of the placed league is not uniform. The watering of the gauge placed prior to the placement of the asphalt mixture is not uniform and part of it has been displaced by the construction equipment used in this work front, which may favor the detachment of the recently placed mixture.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1138
    Collections
    • Informes [1094]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr