• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Informe de Auditoría Técnica externa de seguridad víal proyecto víal Naranjo-Florencia

    Thumbnail
    View/Open
    LM-PI-PV-AT-68F-06 Proyecto Vial Naranjo-Florencia.pdf (980.0Kb)
    Date
    2006-10
    Author
    Chaverri Jiménez, Jenny
    Picado Abarca, Jorge
    Metadata
    Show full item record
    Abstract
    La principal deficiencia encontrada en los planos constructivos se resume en la falta de consistencia del diseño geométrico, reflejado en un irregular perfil de velocidades de operación esperado para esta ruta. Adicionalmente, se considera de alto riesgo para los potenciales conductores de esta carretera, el hecho de que los análisis revelaron un porcentaje muy reducido de la carretera con condiciones geométricas propicias para realizar maniobras de adelantamiento, ante la eventual formación de “columnas” de vehículos en los tramos de un único carril por sentido. Esta última condición de un único carril por sentido es la predominante en este proyecto de carretera. El diseño del proyecto deberá ser actualizado en relación al señalamiento vial propuesto, de tal forma que se dé cumplimiento al criterio de estandarización de la demarcación, conforme lo indica el Manual Centroamericano de Dispositivos Uniformes para el Control del Tránsito. Adicionalmente, se consideran insuficientes los controles mostrados en planos y propuestos para la regulación de la velocidad máxima permitida.
     
    The main deficiency found in the construction plans is summarized in the lack of consistency of the geometric design, reflected in an irregular profile of operating speeds expected for this route. Additionally, it is considered high risk for potential drivers of this road, the fact that the analysis revealed a very small percentage of the road with geometric conditions conducive to overtaking maneuvers, before the possible formation of "columns" of vehicles in the sections of a single lane in each direction. This last condition of a single lane in each direction is the predominant one in this highway project. The design of the project must be updated in relation to the proposed road marking, in such a way that the standardization criterion of the demarcation is complied with, as indicated in the Central American Manual of Uniform Devices for Traffic Control. Additionally, the controls shown in plans and proposed for the regulation of the maximum allowed speed are considered insufficient.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1111
    Collections
    • Informes [1127]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr