• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    LABORATORIO MOPT ENCARGADO DE LA VERIFICACIÓN DEL CONTROL DE CALIDAD UBICADO EN PLANTEL DEL MOPT SAN RAMÓN PROYECTO “CONSTRUCCIÓN DE LA NUEVA CARRETERA A SAN CARLOS, SECCIÓN I: SIFÓN – LA ABUNDANCIA”

    Thumbnail
    View/Open
    LM-PI-PV-AT-38-06 Laboratorio MOPT Proyecto; Construcción de la nueva carretera a San Carlos.pdf (1.272Mb)
    Date
    2006-06
    Author
    Cervantes-Calvo, Víctor
    Morales-Granados, Guillermo
    Rodríguez-Castro, Ellen
    Chaverri-Jiménez, Jenny
    Metadata
    Show full item record
    Abstract
    Las instalaciones del laboratorio no proporcionan un nivel de seguridad que garantice la protección de los equipos, muestras y documentación que forman parte del proceso de verificación de la calidad de los materiales y obras del proyecto, además, no ofrecen las condiciones mínimas ni se han definido políticas para el resguardo y almacenamiento de equipo y muestras de materiales. El laboratorio no demostró mediante documentos (certificados y etiquetas de calibración, registros, entre otros) que se mantenga implementado de forma activa un programa de control metrológico (calibración, comprobación y mantenimiento) de todos los equipos de medición y ensayo con que cuenta el laboratorio de verificación de la calidad.
     
    The laboratory facilities do not provide a level of security that guarantees the protection of the equipment, samples and documentation that are part of the process of verification of the quality of the materials and works of the project, in addition, they do not offer the minimum conditions nor have they been defined policies for the safekeeping and storage of equipment and material samples. The laboratory did not demonstrate by means of documents (certificates and calibration labels, records, among others) that an active program of metrological control (calibration, checking and maintenance) of all the measuring and testing equipment available to the laboratory is actively implemented. of quality verification.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1104
    Collections
    • Informes [984]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr