• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Mejoramiento de la ruta nacional N° 36, Sección:Bribí-Sixaola LPCO-015-00

    Thumbnail
    View/Open
    LM-PI-PV-AT-19-05 Mejoramiento de la Ruta Nacional N°36, Sección Bri-Bri; Sixaola.pdf (510.7Kb)
    Date
    2005
    Author
    Rodríguez Mora, Marcos
    Herrera Jiménez, Edgar
    Arriola Guzmán, Raquel
    Metadata
    Show full item record
    Abstract
    De acuerdo con el muestreo de mezcla asfáltica realizado por el LANAMME, se detectó variabilidad excesiva en los parámetros de granulometría, contenido de asfalto de la mezcla asfáltica en julio 2004 y en los vacíos de campo a partir de núcleos extraídos. Los planes de control de calidad, tanto el de autocontrol como el de verificación no fueron cumplidos de acuerdo con lo establecido contractualmente. Se detectaron además ambigüedades y divergencias entre ambos planes, los cuales debían ser complementarios uno del otro. Para los proyectos a cargo de la Dirección de Obras y específicamente para este proyecto, Bribrí-Sixaola, el CONAVI no ha implementado el sistema de pago en función de la calidad. Por lo que no está definido qué factores de reducción en el pago, se deben aplicar cuando hay incumplimiento en las especificaciones técnicas de los materiales.
     
    According to the sampling of asphalt mix carried out by LANAMME, excessive variability was detected in the granulometry parameters, asphalt content of the asphalt mixture in July 2004 and in field vacuums from extracted cores. The quality control plans, both the self-control and the verification were not complied with in accordance with the contractually established. Ambiguities and divergences were also detected between both plans, which should be complementary to each other. For the projects in charge of the Works Directorate and specifically for this project, Bribrí-Sixaola, CONAVI has not implemented the payment system based on quality. Therefore, it is not defined what reduction factors in the payment should be applied when there is a breach in the technical specifications of the materials.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1076
    Collections
    • Informes [1100]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr