    PROYECTO: RECONSTRUCCIÓN Y MEJORAMIENTO DEL PROYECTO CRUCE DE MORAVIA CRUCE IPIS RUTA NACIONAL 218 SECCIÓN BOMBA MASÍSCLÍNICA JERUSALEM. LICITACIÓN PUBLICA No 73-98 DEL MINISTERIO DE OBRAS PUBLICAS Y TRANSPORTES

    Thumbnail
    View/Open
    LM-PI-PV-AT-62-04 Reconstrucción y mejoramiento del cruce Moravia-Ipis. Ruta Nacional 218, Sección Bomba Masís-Clínica Jerusalem.pdf (408.2Kb)
    Date
    2004-11
    Author
    Rodríguez-Mora, Marcos
    Salas-Chaves, Mauricio
    Bogantes-González, Roy
    Metadata
    Show full item record
    Abstract
    De la planificación del proyecto: Debido a su entorno netamente urbano y el alto volumen de tránsito que maneja, el proyecto presenta un alto nivel de complejidad tanto para su diseño como en su etapa constructiva. Del control administrativo y modificaciones al proyecto La gran cantidad de redes de diversos tipos enterradas (agua potable, aguas negras, cableado subterráneo) complicó la labor constructiva y generó una gran cantidad de labores imprevistas que menoscabaron el presupuesto original de la obra. Adicionalmente, la necesaria intervención de varias entidades públicas en el proyecto (AyA, ICE, CNFL, Municipalidad) dificultó el cumplimiento del programa de trabajo original. Del control de calidad de materiales: Se realizó un control deficiente de la calidad de los agregados utilizado en la elaboración del concreto Portland.
     
    From project planning: Due to its clearly urban environment and the high volume of traffic it handles, the project presents a high level of complexity for both its design and its construction stage. From administrative control and modifications to the project The large number of networks of various types buried (drinking water, sewage, underground wiring) complicated the constructive work and generated a large amount of unforeseen work that undermined the original budget of the work. Additionally, the necessary intervention of several public entities in the project (AyA, ICE, CNFL, Municipality) made it difficult to comply with the original work program. From quality control of materials: Poor quality control of aggregates used in Portland concrete was performed.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1074
    Collections
    • Informes [1022]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr