• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Conservación vial de Heredia y Alajuela LPCO 14-01

    Thumbnail
    View/Open
    LM-PI-PV-AT-114-03 Conservación Vial de la Zona de Alajuela y Heredia.pdf (2.641Mb)
    Date
    2003-10
    Author
    Rodríguez Mora, Marcos
    Barrantes Jiménez, Roy
    Martínez Martínez, Oscar
    Metadata
    Show full item record
    Abstract
    La Auditoría detecta, con base en la documentación solicitada y a las entrevistas realizadas al personal asignado al proyecto detectó deficiencias en cuanto al control de calidad de los trabajos realizados por el contratista, al no exigir oportunamente la construcción de franjas de control o paños de prueba de compactación conforme lo establece el cartel de licitación. Este problema de control de calidad también se refleja en el proceso de extracción de núcleos que se hace de forma extemporánea, en incumplimiento claro con los plazo establecidos en el cartel de licitación. La mezcla asfáltica producida para el proyecto de Conservación Vial de Heredia y Alajuela (LPCO-14-01) presenta en el periodo evaluado por el Lanamme incumplimiento en cuanto a los vacíos. Este es un parámetro de evaluación de la mezcla asfáltica muy importante que determina en gran medida la durabilidad de los trabajos realizados (bacheos o sobrecapas). La presencia de vacíos muy bajos (menores a 3.5%) es una condición característica de mezclas propensas a deformarse prematuramente, a presentar problemas de exudación y a manifestarse en capas de rodamiento con excesiva lisura. La planta no cuenta con planes definidos en cuanto evaluación, verificación o mantenimiento de cada uno de sus componentes electro mecánicos
     
    The Audit detects, based on the requested documentation and the interviews carried out with the personnel assigned to the project, that it detected deficiencies in the quality control of the work carried out by the contractor, by not requiring the construction of control strips or test strips in a timely manner. compaction as established by the bidding poster. This problem of quality control is also reflected in the process of core extraction that is done extemporaneously, in clear breach with the term established in the bidding poster. The asphalt mixture produced for the Road Conservation project of Heredia and Alajuela (LPCO-14-01) presents, in the period evaluated by the Lanamme, a breach of the gaps. This is a parameter of evaluation of the very important asphalt mixture that determines to a great extent the durability of the work carried out (patching or overlapping). The presence of very low voids (less than 3.5%) is a characteristic condition of mixtures prone to deform prematurely, to present problems of exudation and to manifest in layers of rolling with excessive smoothness. The plant does not have defined plans regarding evaluation, verification or maintenance of each of its electro-mechanical components.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1068
    Collections
    • Informes [1094]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr