• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Mejoramiento de la ruta N° 622 Esparza-Juanilama-Salinas. Licitación LPCO-034-00 (CONAVI)

    Thumbnail
    View/Open
    LM-PI-PV-AT-040-02 Mejoramiento de la ruta N°622 Esparza-Juanilama-Salinas.pdf (6.512Mb)
    Date
    2003-04
    Author
    Rojas, Eduardo
    Baltodano, Federico
    Metadata
    Show full item record
    Abstract
    En la ejecución del proyecto: Mejoramiento de la Ruta Nacional No. 622 Sección: Esparza – Juanilama - Salinas, se obtuvieron los siguientes resultados: La ausencia de datos sobre el diseño del pavimento (vida útil, tránsito) y la falta de una evaluación previa de la condición de la Subbase existente, son prueba de que el estudio básico del proyecto estuvo incompleto antes de publicar la licitación para construir esta obra. No se encontraron evidencias de la aplicación del sistema de medición y pago de estimaciones que se estipula en el Manual de Construcción MC-83, en el código CR-77. La labor de bacheo con mezcla asfáltica no fue registrada adecuadamente y no tiene soporte preciso de las cantidades y sitios de colocación de esta mezcla.
     
    In the execution of the project: Improvement of National Route No. 622 Section: Esparza - Juanilama - Salinas, the following results were obtained: The absence of data about the design of the pavement (useful life, transit) and the lack of a prior evaluation of the condition of the existing subbase, are proof that the basic study of the project was incomplete before publishing the tender to build this work . No evidence was found of the application of the measurement and payment of estimates system stipulated in the MC-83 Construction Manual, in the code CR-77. The work of patching with asphalt mixture was not recorded properly and does not have precise support of the quantities and placement sites of this mixture.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1060
    Collections
    • Informes [1100]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr