• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    LABORATORIO ING. OSCAR JULIO MENDEZ, ENSAYOS Y CONTROL DE CALIDAD

    Thumbnail
    View/Open
    LM-PI-PV-AT-24-02 Laboratorio Ing. Oscar Julio Mendez. Ensayos y control de calidad.pdf (6.286Mb)
    Date
    2002-11
    Author
    Tioli-Mora, Humberto
    Sibaja-Saborío, José Pablo
    Murillo, Patricia
    Cervantes-Calvo, Víctor
    Metadata
    Show full item record
    Abstract
    Del siguiente informe se dan a conocer los resultados de la auditoria en el Laboratorio Ing. Oscar Julio Méndez, de lo que se tiene la siguiente información: Es necesario que se corrijan todas las no conformidades y se implemente un sistema de calidad basado en la norma INTE ISO 17025, para que los ensayos de control tengan suficiente confiabilidad y sean verdaderamente útiles para garantizar las inversiones en obras. En cuanto a la Administración exige una lista mínima de equipos de laboratorio en los carteles de conservación vial y no lo hace en forma similar para los carteles de las obras por contrato. No debe haber excepciones Además, debe cumplir con el plan de mantenimiento y calibración de los equipos, llevarlo a la práctica y demostrarlo con registros completos y confiables. Por último, el laboratorio no ha iniciado el proceso de implementación de un sistema de aseguramiento de la calidad, basado en la norma INTE ISO/IEC 17025:2000.
     
    The results of the audit in the Ing. Oscar Julio Méndez Laboratory are presented in the following report, which gives the following information: It is necessary to correct all non-conformities and implement a quality system based on the INTE ISO 17025 standard, so that the control tests have sufficient reliability and are truly useful to guarantee investments in works. As for the Administration, it requires a minimum list of laboratory equipment in the road conservation posters and does not do it in a similar way for the posters of the works by contract. They must not be any exception. In addition, they must comply with the equipment maintenance and calibration plan, put it into practice and prove it with complete and reliable records. Finally, the laboratory has not started the process of implementing a quality assurance system, based on the INTE ISO / IEC 17025: 2000 standard.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1059
    Collections
    • Informes [984]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr