dc.description.abstractEl presente informe muestra el análisis de las objeciones presentadas por la Comisión Revisora del MOPT (CRAM), el cual indica la procedencia o no de dichas objeciones y su justificación, según el criterio técnico del LanammeUCR. Para esta tercera entrega parcial, se analizaron alrededor de 115 objeciones presentadas por la CRAM, las cuales conllevaron un proceso minucioso de modificaciones relacionadas con cotas, eliminación, corrección e incorporación d especificaciones técnicas y constructivas, en consistencia con lo indicado en el CR-2010. En este informe se hace la entrega a la Administración, de un total 32 diseños estándar relacionados con: control de erosión del suelo, refuerzo de taludes y muros de retención; gaviones y colchones de revestimiento; muros de retención alternativos; vertederos de metal corrugado; aceras , entradas a propiedades y senderos; y túneles falsos. Además, producto de las observaciones recibidas por parte de la CRAM y del análisis realizado por parte del LanammeUCR, se incluye un total de 16 diseño estándar adicionales en temas como: control de erosión del suelo, refuerzo de taludes y muros de retención; gaviones y colchones de revestimiento ; muros de retención alternativos; así como cunetas y contracunetas. Al presente informe se adjunta en disco compacto los diseños en DWG y PDF, que contienen los cambios derivados de la revisión.es
dc.description.abstractThis report shows the analysis of the objections presented by the Review Commission (CRAM) from the MOPT, which indicates if they proceed or not and their justification, according to the technical criteria of the LanammeUCR. For this third partial delivery, about 115 objections presented by the CRAM were analyzed, which involved a detailed process of modifications related to dimensions, elimination, correction and incorporation of technical and construction specifications, in accordance with the indicated in CR-2010. In this report, is given to the Administration a total of 32 standard designs related to: soil erosion control, reinforcement of slopes and retaining walls; gabions and rock mattresses; alternative retaining walls; corrugated metal dumps; sidewalks, entrances to properties and trails and false tunnels. In addition, as a result of the observations received by the CRAM and the analysis made by the LanammeUCR, a total of 16 additional standard designs are included in topics such as soil erosion control, reinforcement of slopes and retaining walls; gabions and rock mattresses; alternative retaining walls; as well as ditches and catch water drains. The DWG and PDF designs, which contain the changes derived from the revision, are attached report in a CD.es
dc.language.isoeses
dc.publisherLaboratorio Nacional de Materiales y Modelos Estructurales (LanammeUCR)es
dc.subjectPITRAes
dc.subjectDiseños estándares
dc.subjectobjecioneses
dc.subjectCRAMes
dc.subjectCR-2010es
dc.subjectstandard designses
dc.subjectobjectionses
dc.titleEstudio de objeciones presentadas por la comisión revisora del MOPT a las propuestas del manual de diseños estándar para la construcción de estructuras conexas, MDE 2017. Entrega parcial IIIes
dc.title.alternativeLM-PI-UNAT-007-17
dc.typedocumentación técnica
dc.typetechnical documentationen
dc.typedocumentación técnicaes
dc.description.procedenceUCR::Vicerrectoría de Investigación::Unidades de Investigación::Ingeniería::LanammeUCRes


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem