Mostrar el registro sencillo del ítem

dc.contributor.authorCervantes Calvo, Víctor
dc.contributor.authorSequeira Rojas, Wendy
dc.contributor.authorSalas Chaves, Mauricio
dc.contributor.authorChaverri Jiménez, Jenny
dc.contributor.authorLoría Salazar, Luis Guillermo
dc.date.accessioned2017-04-04T20:17:06Z
dc.date.available2017-04-04T20:17:06Z
dc.date.issued2013-09
dc.identifier.urihttps://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/160
dc.description.abstractCalidad del material de subbase granular y base granular colocados en el proyecto: Los resultados de granulometría reportados por los laboratorios de control de calidad y verificación de calidad para los materiales granulares de subbase y base evidencian incumplimientos en diversos tamices con relación a la granulometría establecida en las Especificaciones Especiales, para el periodo de estudio (noviembre 2011 a marzo de 2012). Con relación a los límites de consistencia, densidad y humedad en sitio e índice de soporte (CBR), demuestran cumplimiento de las especificaciones establecidas. Calidad del material de base estabilizada colocado en el proyecto: Los resultados de los ensayos granulométricos realizados por los laboratorios de control de calidad y verificación de calidad para el material granular para base estabilizada muestran incumplimientos para diversos tamices establecidos en la curva granulométrica contractual, durante el periodo de análisis (noviembre 2011 a marzo de 2012). Asimismo se determina que los resultados de resistencia a la compresión de la base estabilizada con cemento, reportados por los laboratorios de control de calidad y verificación de calidad, fueron variables con relación a la resistencia requerida en el diseño para el mismo periodo de análisis. Especificaciones para subbase granular y base granular: Los resultados de calidad reportados por los laboratorios de control de calidad y verificación de calidad, para los materiales granulares de subbase, base y base estabilizada fueron valorados con especificaciones distintas a las establecidas en el Cartel de Licitación.es
dc.description.abstractQuality of granular subbase and granular base material placed in the project: The results of grading reported by laboratories of quality control and quality assurance for granular materials of subbase and base show failure in various sieves relative to the grading established in Special Specifications for the study period (November 2011 to March 2012). With regard to the limits of consistency, density and humidity on site and support index (CBR) demonstrate compliance with the established specifications. Quality of the stabilized base material placed in the project: The results of the grading tests performed by laboratories of quality control and quality assurance for the granular material for stabilized base show defaults for various sieves set out in the contractual grading curve during the analysis period (November 2011 to March 2012). Likewise it is determined that the results of compressive strength of cement stabilized base, reported by quality control and quality assurance laboratories, were variable in relation to the strength required in the design for the same period of analysis. Specifications for granular subbase and granular base: Quality results reported by quality control and quality assurance laboratories, for granular subbase, base and stabilized base materials were assessed with different specifications to those in the Tender Cartel.es
dc.language.isoeses
dc.publisherLaboratorio Nacional de Materiales y Modelos Estructurales (LanammeUCR)es
dc.relation.ispartofseriesLM-PI-AT-045-13
dc.subjectPITRAes
dc.subjectsubbase granulares
dc.subjectbraduación Bes
dc.subjectbase estabilizada con cementoes
dc.subjectresistenciaes
dc.subjectgranulometríaes
dc.subjectLímites Atterberges
dc.subjectgranular subbaseen
dc.subjectb gradinges
dc.subjectcement stabilized basees
dc.subjectAtterberg Limitses
dc.subjectGradinges
dc.subjectResistancees
dc.titleEvaluación estadística de los ensayos de calidad de los materiales utilizados en el proyecto de rehabilitación de la ruta nacional no.1. Carretera Bernardo Soto: Tramo aeropuerto-manolos. Proyecto: Conservación de la Red Vial Nacional Pavimentada. Licitación Pública no. 2009LN-000003-CV. Línea 18 Zona 1-5: Alajuela Norte (Segunda Parte)es
dc.typeinforme técnicoes
dc.description.procedenceUCR::Vicerrectoría de Investigación::Unidades de Investigación::Ingeniería::LanammeUCRes
dc.description.procedenceUCR::Vicerrectoría de Investigación::Unidades de Investigación::Ingeniería::LanammeUCR


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem