Mostrar el registro sencillo del ítem
Evaluación de la calidad de los materiales y procesos constructivos proyecto: Contratación Directa No. 2013CV-000017-0Di00: Rehabilitación integral (Subestructura y superestructura) del puente sobre el río Virilla, Ruta Nacional No. 1, Autopista General Cañas
dc.contributor.author | Cervantes Calvo, Víctor | |
dc.contributor.author | Fonseca Chaves, Francisco | |
dc.date.accessioned | 2019-04-04T21:19:08Z | |
dc.date.available | 2019-04-04T21:19:08Z | |
dc.date.issued | 2017 | |
dc.identifier.uri | https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1541 | |
dc.description.abstract | Sobre las prácticas constructivas observadas en el provecto: En las estructuras metálicas se detectó que las alas de las vigas tenían bordes afilados lo cual puede contribuir a su deterioro prematuro debido que no se podría proveer un espesor de pintura adecuado. Sobre los materiales utilizados en el provecto (concreto): Se evidenciaron algunos incumplimientos en los resultados de resistencia a la compresión y temperatura de colocación para concretos de 280kg/cm2 reportados por el LanammeUCR, al hacer el análisis estadístico se observa que el lote cumple con la especificación solicitada en el CR-2010. Sobre el diseño de mezcla del concreto: Se observa el diseño de mezcla aportado por la Administración no cuenta con información solicitada por la norma FHWA Form 1608 como lo solicita el CR-2010. Entre las omisiones está el asentamiento de la mezcla, el contenido de aire y los ensayos para determinar las características de los agregados Sobre los ensayos al concreto fresco: Se evidencia que no se ejecuta el ensayo de contenido de aire al concreto fresco como lo indican las normas ASTM C172 y ASTM C31 para muestreo y elaboración de especímenes de concreto, respectivamente, tanto por el laboratorio de control como el laboratorio de verificación de la calidad del proyecto. Sobre los materiales utilizados en el provecto (acero de refuerzo): En el caso del acero de refuerzo utilizado en los elementos colados en sitio del proyecto en cuestión se cumple con las características de fabricación establecidas en la norma ASTM A706. Sobre los materiales utilizados en el provecto (acero estructural): Para el caso del acero estructural se determina que el material muestreado por el LanammeUCR cumple con las especificaciones solicitadas para un Acero A36 el cual es el solicitado en los planos del proyecto. | es |
dc.description.abstract | On the constructive practices observed in the project: It was detected in the metallic structures that the wings of the beams had sharp edges which can contribute to their premature deterioration due to the fact that an adequate thickness of paint could not be provided. About the materials used in the project (concrete): There were some non-compliances in the results of compression resistance and placement temperature for concretes of 280 kg/cm2 reported by the LanammeUCR, when doing the statistical analysis, it is observed that the batch complies with the specification requested in CR-2010. About the concrete mix design: It is observed that the mix design provided by the Administration does not have information requested by the FHWA Form 1608 as requested by the CR-2010. Among the omissions is the settlement of the mixture, the air content and the tests to determine the characteristics of the aggregates On tests on fresh concrete: It is evident that the air content test on fresh concrete is not carried out as indicated by ASTM C172 and ASTM C31 standards for sampling and preparation of concrete specimens, respectively, both by the control laboratory and the laboratory for quality verification of the project. About the materials used in the project (reinforcing steel): In the case of the reinforcement steel used in the cast elements in situ of the project in question, the manufacturing characteristics established in the ASTM A706 standard are met. About the materials used in the project (structural steel): In the case of structural steel, it is determined that the material sampled by the LanammeUCR meets the specifications requested for an A36 Steel, which is the one requested in the project plans. | es |
dc.publisher | Laboratorio Nacional de Materiales y Modelos Estructurales (LanammeUCR) | es |
dc.subject | puente | es |
dc.subject | Río Virilla | es |
dc.subject | Ruta No. 1 | es |
dc.subject | muestreo de concreto | es |
dc.subject | acero | es |
dc.subject | bridge | es |
dc.subject | Virilla River | es |
dc.subject | Route No. 1 | es |
dc.subject | Concrete sampling | es |
dc.subject | steel sampling | es |
dc.title | Evaluación de la calidad de los materiales y procesos constructivos proyecto: Contratación Directa No. 2013CV-000017-0Di00: Rehabilitación integral (Subestructura y superestructura) del puente sobre el río Virilla, Ruta Nacional No. 1, Autopista General Cañas | es |
dc.title.alternative | LM-PI-AT-033-16 | es |
dc.type | informe técnico | es |
dc.description.procedence | UCR::Vicerrectoría de Investigación::Unidades de Investigación::Ingeniería::LanammeUCR | es |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Informes [1088]