• Login
    View Item 
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    •   DSpace Home
    • Laboratorio Nacional de Materiales y Modelos Estructurales - UCR
    • Programa de Infraestructura del Transporte
    • Informes
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    PROYECTO DE CONSERVACIÓN VIAL DE SAN JOSÉ Ruta 39, Circunvalación LPCO-018-01

    Thumbnail
    View/Open
    LM-PI-PV-AT-20F-06 Proyecto de Conservación Vial San José; Ruta 39; Circunvalación.PDF (900.0Kb)
    Date
    2006-10
    Author
    Chaverri-Jiménez, Jenny
    Barrantes-Jiménez, Roy
    Salas-Chaves, Mauricio
    Metadata
    Show full item record
    Abstract
    Este proyecto vial auditado da evidencia de la falta de planificación de conservación vial que existe en CONAVI, lo cual se refleja en obras que inician sin estudios preliminares completos ni diseños formales del pavimento, que justifiquen su inversión y garanticen el mejoramiento de la red vial nacional y su durabilidad. El sistema de verificación de la calidad de los poros (vacíos de la capa asfáltica) en sitio, definido para los proyectos de conservación vial, no es aplicado para evitar o prevenir las deficiencias del autocontrol del contratista. En muchas ocasiones ni siquiera se aplica y se cuenta únicamente con los ensayos de autocontrol del contratista para justificar el pago de una obra que se recibe a satisfacción de la administración.
     
    This audited road project gives evidence of the lack of road conservation planning that exists in CONAVI, which is reflected in works that start without complete preliminary studies or formal pavement designs, that justify their investment and guarantee the improvement of the national road network and its durability. The system of verification of pore quality (asphalt layer voids) on site, defined for road conservation projects, is not applied to avoid or prevent deficiencies in the contractor's self-control. In many cases it is not even applied and there is only the contractor's self-control tests to justify the payment of a work that is received to the satisfaction of the administration.
     
    URI
    https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1103
    Collections
    • Informes [1026]

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr

     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

     © 2018-2020  Laboratorio Nacional de Materiales y Modelos Estructurales
    Contact Us | Send Feedback | 📞 +506 2511-2500 |  ✉ direccion.lanamme@ucr.ac.cr