dc.contributor.authorCervantes Calvo, Víctor
dc.contributor.authorFonseca Chaves, Francisco
dc.contributor.authorSequeira Rojas, Wendy
dc.contributor.authorLoría Salazar, Luis Guillermo
dc.date.accessioned2017-03-01T14:37:34Z
dc.date.available2017-03-01T14:37:34Z
dc.date.issued2015-01
dc.identifier.urihttps://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/33
dc.description.abstractSobre las deficiencias constructivas observadas en los elementos estructurales de algunos de los puentes del proyecto: Durante las visitas al proyecto se encontraron defectos constructivos producto de prácticas constructivas inadecuadas. La Administración procedió a solicitar las acciones correctivas correspondientes y es responsabilidad de esta velar por el cumplimiento de los estándares de calidad necesarios para asegurar la inversión pública y el desarrollo del proyecto acorde con la normativa nacional y las buenas prácticas de la ingeniería. Sobre las oportunidades de mejora en la inspección del proyecto: Durante las visitas realizadas al proyecto en el periodo de realización de esta auditoría técnica, se detectó que algunos elementos no estructurales fueron construidos con detalles distintos a los indicados en planos constructivos y no se ha evidenciado documentación que justifique la aprobación de dichos cambios. Sobre aspectos de gestión durante la ejecución el proyecto: Durante el desarrollo del proyecto una de las estructuras presentó deficiencias en los valores de resistencia a compresión del concreto por lo que la Administración, solicitó extracción de núcleos. Puesto que la resistencia a la compresión no fue la esperada se le solicitó al contratista que propusiera una solución al defecto encontrado. Es responsabilidad de la Administración asegurarse que las soluciones propuestas subsanen las deficiencias encontradas y que aseguren la calidad de proyecto cumpliendo todos los estándares solicitados y las buenas prácticas de la ingeniería. Sobre la calidad de los materiales utilizados en el proyecto (concreto): Los concretos de resistencia a la compresión a los 28 días de 225 kg/cm2, 245 kg/cm2, 280kg/cm2, 350 kg/cm2 y 700 kg/cm2 cumplen con la especificación establecida para las resistencias solicitadas para el proyecto. En cuanto a la temperatura de la mezcla antes de la colocación se presentan valores superiores a los especificados para el proyecto durante el periodo evaluado.es
dc.description.abstractAbout the constructive deficiencies observed in the structural elements of some of the bridges of the project: During visits to the project, construction defects product of inadequate construction practices were found. Administration proceeded to apply corrective actions and is responsible for ensuring the compliance with the quality standards necessary to ensure public investment and project development, in accordance with national standards and good engineering practices. About opportunities for improvement in the inspection of the project: During visits to the project in the period of implementation of this technical audit, it was found that some non-structural elements were built with details other than those specified in the construction plans and it has not been shown documentation that justifies the approval of those changes. About aspects of management during the project execution: During the project development one of the structures presented deficiencies in the values of compressive strength of concrete so the Administration requested coring. Since the compressive strength was not the expected, it was requested to the contractor to propose a solution to the defect found. It is the responsibility of the Administration to ensure that the solutions proposed remedy the deficiencies and guarantee the quality of the project, meeting all the standards required and good engineering practices. About the quality of the materials used in the project (concrete): The compressive strength of concrete at 28 days of 225 kg/cm2, 245 kg/cm2, 280kg/cm2, 350 kg/cm2, and 700 kg/cm2 meet the specification set for the resistance requested of the project. Regarding the mixture temperature before the placement, were registered higher values to the specified for the project during the evaluated period.es
dc.language.isoeses
dc.publisherLaboratorio Nacional de Materiales y Modelos Estructurales (LanammeUCR)es
dc.subjectPITRAes
dc.subjectCañases
dc.subjectLiberiaes
dc.subjectMuestreo de concretoes
dc.subjectInspecciónes
dc.subjectPuenteses
dc.subjectBridgees
dc.subjectConcrete samplinges
dc.subjectInspectiones
dc.subjectRuta Nacioanl 1
dc.subjectCARRETERA INTERAMERICANA NORTE
dc.subjectInforme de fiscalización
dc.subjectAuditorias técnicas de puentes
dc.subjectPITRA
dc.subjectUnidad de Puentes
dc.subjectUnidad Auditoria Técnica
dc.titleEvaluación de la calidad de los materiales y procesos constructivos en el proyecto: diseño y construcción de 18 puentes en la Ruta Nacional N° 1, Carretera Interamericana Norte, sección Cañas-Liberia, licitación LPI NO.2011LI-000026-01DE00es
dc.title.alternativeLM-PI-AT-062-14
dc.typeinforme técnicoes
dc.description.procedenceUCR::Vicerrectoría de Investigación::Unidades de Investigación::Ingeniería::LanammeUCRes